NYCT Sandy Repair Project Rockaway Line Wrap-Up

Queens, NY

Project Value:
$49M

Start & End Dates:
2021 – 2024

PP#: 0000-0000 

Reference:
Mr. Nino Pirraglia
Technical Representative
JACOBS

E: nino.pirraglia@jacobs.com

PACO serves as the linchpin that keeps construction projects on track and ensures successful outcomes. Here we showcase projects that are either ongoing, or that have been executed efficiently while maintaining the highest standards of quality.

The MTA New York City Transit Rockaway Line serves as a critical transportation link between mainland Queens and the Rockaway peninsula. This project involved extensive rehabilitation and upgrade efforts to improve the resilience and functionality of key infrastructure along the line. Work included the design and construction of viaduct rehabilitation at the Hammels Wye Campus, as well as repairs along both the east and west branches of the line.

Additional project elements focused on enhancing system reliability and resilience, including the design and installation of flood mitigation measures at multiple locations along the corridor. The project also included the construction of a new signal tower, installation of a track crossover at Beach 105th Street Station, and associated traction power, signal systems, and utility upgrades. Furthermore, electrical and mechanical components of the South Channel Bridge were replaced to ensure continued safe and efficient operations.

The PACO Group team gathers around a conference table to discuss strategies.

PACO SERVICES

01.  CPM Scheduling Services