New York City Transit 148th Street Yard Resiliency Project

New York, N.Y.

Project Value:
$15M

Start & End Dates:
2014 – 2019

PP#:: 0000 – 0000

Reference:
Mr. Vincent Cassano
Principal
Jacobs
2 Penn Plaza
Suite 0603
New York, N.Y. 10121

C: 914.819.8896
E: Vincent.cassano@jacobs.com

PACO serves as the linchpin that keeps construction projects on track and ensures successful outcomes. Here we showcase projects that are either ongoing, or that have been executed efficiently while maintaining the highest standards of quality.

The 148th Street Yard resiliency project was initiated following damage sustained during Superstorm Sandy, when floodwaters from the Harlem River entered the yard through gaps in unfinished seawall construction. Although the recently reconstructed seawall was built to provide Category 1 storm protection, water levels during the storm rose to just below the crest of the new walls, allowing flooding that damaged power cables, hand switches, and duct banks within the yard.

To strengthen long-term resilience, the project upgrades the facility to meet Category 2 storm protection standards. Improvements include raising the recently completed floodwalls, extending flood protection around the yard perimeter, and installing a protective barrier at the tunnel portal to prevent future flood intrusion. These measures are designed to safeguard critical rail infrastructure and maintain operational reliability during severe storm events.

The PACO Group team gathers around a conference table to discuss strategies.

PACO SERVICES

01. Construction Project Management & Inspection Services 

02.  Cost Estimating

03.  CPM Scheduling

04.  Mechanical Engineering 

05.  Environmental Engineering 

06.  Procurement Services

07.  Project Management 

08.  Risk Assessment Services 

08.  Specifications Development and Review 

09.  Systems Engineering 

10.  Track & Signals Engineering