Norfolk Light Rail Transit Project: “The Tide”

Hampton Road, VA

Project Value:
$232M

Start & End Dates:
2006 – 2009

PP#: 0000-0000

Reference:
Parsons Brinckerhoff
Quade & Douglas –
Mr. Wright Parkes,
Director of
Procurement
Hampton Roads
Transit

PACO serves as the linchpin that keeps construction projects on track and ensures successful outcomes. Here we showcase projects that are either ongoing, or that have been executed efficiently while maintaining the highest standards of quality.

PACO Group, Inc. (PACO) developed the methodology, processes, and procedures for managing the project’s technical baselines and for integrating using ccsNet® into the overall project management process. The Hampton Roads Transit (HRT) Norfolk Light Rail Transit System, known as “The Tide,” is a 7.4-mile light rail line serving Norfolk, Virginia. The system begins at a western terminus near the Eastern Virginia Medical Center and travels east on a dedicated right of-way through downtown Norfolk to Norfolk State University.

Project components include a light rail transit system composed of nine low-floor, 85-foot light rail vehicles and an exclusive double track guideway that generally follows the Norfolk Southern Railroad right-of-way. The project includes 11 stations, six of which provide bus drop-off areas and four of which include park-and-ride facilities. Stations are primarily at-grade, constructed as one-car, 90-foot platforms, and are designed to accommodate future expansion to three-car platforms. The project also includes a Vehicle Storage and Maintenance Facility (VSMF) located south of the LRT alignment between Norfolk State University and Interstate 264 to support system operations and maintenance.

The PACO Group team gathers around a conference table to discuss strategies.

PACO SERVICES

01. Configuration Management 

02. Document Management 

03. Cost Estimating

04. Scheduling