Miami-Dade Aviation Department MIA/MIC Connector

Miami, Florida

Project Value:
$400M

Start & End Dates:
XXXX – XXXX

PP#: 0000-0000 

Reference:
Mr. Sanjeey Shah, PE
formerly the Deputy
Project Manager
Lea + Elliot
now the principal and
CEO of Sanjeey Shah,
Inc.

E: sshah@ssiconsult.com

PACO serves as the linchpin that keeps construction projects on track and ensures successful outcomes. Here we showcase projects that are either ongoing, or that have been executed efficiently while maintaining the highest standards of quality.

The Miami Mover project involved the development of an Automated Guideway Transit (AGT) system connecting Miami International Airport (MIA) with the Miami Intermodal Center (MIC). The system was designed to improve passenger mobility, reduce terminal area traffic congestion, and provide seamless connections between airport facilities, rental car operations, commuter rail services, and regional park-and-ride transportation systems.

The PACO Group team gathers around a conference table to discuss strategies.

PACO SERVICES

01. Scheduling 

02. Cost control 

03. Quality Assurance / Quality Control (QA/QC) 

04. Configuration Management

05. Value engineering