PANYNJ Critical Path Repair and Resiliency Project
New York and New Jersey
Project Value:
$25M
Start & End Dates:
2018 – 2021
PP#:0000 – 0000
Reference:
Mr. David Beckett
Sr. Vice President
AECOM
605 3rd Avenue
New York, NY 10158
E: David.beckett@aecom.com
This project focused on restoring and strengthening the PATH transit system following the extensive damage caused by Superstorm Sandy. Flooding from storm surge severely impacted tunnels, infrastructure, and critical electrical and mechanical systems, while high windscaused structural damage to multiple facilities. The effort aimed to address these damages and restore safe, reliable service across the system.
In addition to repairs, the project emphasized long-term resiliency by upgrading and hardening infrastructure to better withstand future extreme weather events. This included replacement of key systems such as substations, signals, elevators, and escalators, as well as system-wide inspections and improvements to ensure operational continuity and enhanced protection against similar incidents.
PACO SERVICES
01. Scheduling
02. Office Engineering
03. Inspection Services