Charlotte Area Transit Systems (CATS) South Corridor Light Rail Project

Charlotte, NC

Project Value:
$313M

Start & End Dates:
2004 – 2007

PP#:: 0000 – 0000

Reference:
STV, Inc.
919 Haywood Road
Suite 103
Sylva, NC

PACO serves as the linchpin that keeps construction projects on track and ensures successful outcomes. Here we showcase projects that are either ongoing, or that have been executed efficiently while maintaining the highest standards of quality.

PACO Tech, as a subconsultant to STV, provided various services for the South Corridor Light Rail Project (SCLRP), the first line of Charlotte’s rapid transit system. The project consisted of an approximately 11-mile light rail transit (LRT) line extending from Uptown Charlotte south to near the South Carolina border, providing service along a ten-mile corridor to Interstate 485 north of Pineville. The line was designed to improve regional mobility while supporting transit-oriented development throughout the corridor.

The project included 19 station locations selected through a process that emphasized public input and accessibility, with design standards intended to allow each station to complement its surrounding community. A unique element of the SCLRP was the shared-use operation with the Charlotte Trolley along a two-mile segment in South End, including three shared stations in Uptown Charlotte at 7th Street, the Charlotte Transportation Center, and 3rd Street.

The PACO Group team gathers around a conference table to discuss strategies.

PACO SERVICES

01. Cost estimating services 

02.  Preparation of project cost estimates for an approximately 11-mile light rail transit (LRT) corridor 

03.  Cost estimating support for 19 proposed station locations  

04.  Cost analysis related to shared LRT and Charlotte Trolley operations 

05.  Cost estimating for shared stations in Uptown Charlotte (7th Street, Charlotte Transportation Center, and 3rd Street)