MTA Canarsie Tunnel Rehabilitation Project

New York, N.Y.

Project Value:
$1B

PP#:2016 – 0799

Start & End Dates:
2013 – 2017

Reference:
Mr. Rick Wenger
Program Manager
Jacobs
2 Penn Plaza
Suite 0603
New York, N.Y. 10121

C: 415.367.5903

PACO serves as the linchpin that keeps construction projects on track and ensures successful outcomes. Here we showcase projects that are either ongoing, or that have been executed efficiently while maintaining the highest standards of quality.

The Canarsie Tunnel (14th Street Tunnel), which carries the MTA’s L Line between Manhattan and Brooklyn under the East River, sustained severe damage during Superstorm Sandy in 2012 when approximately seven million gallons of salt water flooded the tunnel. Two adjacent 7,100-foot sections were significantly impacted, requiring extensive rehabilitation. The recovery effort involved comprehensive repairs to the tunnel tube and the full replacement of rail systems and life safety equipment damaged by the storm.

The design-build rehabilitation also included upgrades and improvements to supporting infrastructure, including communications, electrical and power systems in substations and stations, 3rd rail replacement, work at the First Avenue substation, and installation of ADA elevators at First Avenue and Bedford Avenue Stations. The project restored critical transit service while modernizing key tunnel and station components to improve resiliency and long-term performance.

The PACO Group team gathers around a conference table to discuss strategies.

PACO SERVICES

01.  Project Controls 

02. Cost Estimating

03. Constructability Review 

04. Project Management Support 

05. Rail & Systems Engineering Support

06. Electrical & Power Systems Support  

07. ADA / Accessibility Coordination 

08. Technical Reporting & Documentation